Beyond the need for power, efficient cooling, storage and switching data inside the data center is necessary to save time and reduce costs. This article addresses practical operational considerations for managing and validating Active Optical Cables (AOC) and Direct Attach Copper (DAC) cables.
Read the source article at epageflip.net
Categories: Data Centers, Fiber, FOTC, SCN
