Site icon Structured Cabling News

Uptime vs. TIA-942: Outcome based or checklist or can it be both? | Edward van Leent | Pulse | LinkedIn

Consultants favouring Uptime are typically using the argument that they are not using a checklist but are assessing designs based on desired outcome. The claim is that ANSI/TIA-942 is not flexible and prevents innovation of designs as it is using a checklist i.e. tick in the box approach. So, let’s examine the true facts of these statements.

Read the source article at World’s Largest Professional Network

Exit mobile version